The Kensington Gold Mine, consisting of the Kensington and adjacent Jualin properties, is located on the east side of the Lynn Canal about 45 miles north-northwest of Juneau, Alaska. Access to the mine is presently by helicopter, float plane or boat from Juneau.

The Kensington property, which contains the mine's reserves, consists of over 6,100 acres of patented and unpatented federal mining claims and state claims. The adjacent Jualin property to the south consists of over 9,000 acres of patented and unpatented federal mining claims and state claims.

The mine is currently expected to produce as much as 125,000 ounces of annual production in early years of operation. Over the life of the mine, Kensington is expected to produce more than 1 million total ounces of gold.

Kensington is currently expected to have a mine life of approximately 10 years, based on proven and probable gold mineral reserves of approximately 1.5 million ounces. The reserves have a grade of 0.27 ounces per ton.

Mining will be conducted underground via ramp access. The primary mining method will be longhole open stoping with drift and fill mining used in the flat-lying, higher grade zone. In some areas, stopes will consist of initial sill development followed by uphole drilling and blasting to recover localized high grade ores.

Kensington will use an on-site flotation mill to produce concentrate that will be shipped elsewhere for processing. The mill will not use harsh chemicals such as cyanide.

The processing facilities are located at an elevation of 980 feet above sea level. Ore will be received from the underground mine by 40-ton trucks. Power is supplied by on-site diesel generators. Gold recovery is by a combination of flotation and gravity concentration, followed by concentrate regrind and cleaner flotation.

Jobs

The Kensington Gold Mine is on the threshold of production with the facilities 90% complete.

Coeur Alaska's mission and values combine Safety, Environment, Integrity, Dedication, Respect, Teamwork, Communication and Growth for the people and land in this majestic area in Southeast Alaska.

Please Visit our booth in the Online Job Fair

Coeur Alaska Inc: Visit our web site.

Job Opportunities


Saturday, October 21, 2017
Crusher Maintenance Tech 1 (Crusher), South Dakota, USA Hot!

Friday, October 20, 2017
Radio Communications Technician, Nevada, USA Hot!

Thursday, October 19, 2017
Operations Manager, Alaska, USA Hot!
Manifest and Billeting Coordinator, Alaska, USA Hot!

Wednesday, October 18, 2017
Mine Geologist, Nevada, USA Hot!

Saturday, October 07, 2017
Mobile Maintenance Supervisor, Alaska, USA Hot!

Friday, October 06, 2017
Haul Truck Operator, Nevada, USA Hot!

Wednesday, October 04, 2017
Process Supervisor, South Dakota, USA Hot!

Saturday, September 23, 2017
Mobile Maintenance General Foreman, Alaska, USA Hot!
Electrician, Alaska, USA Hot!

Saturday, September 09, 2017
Director, IT Infrastructure and Cyber Security, Chicago, IL, USA Hot!

Friday, September 01, 2017
Crusher Operator / Ground Person - Entry Level 1, Nevada, USA Hot!

Tuesday, August 29, 2017
Mobile Maintenance Mechanic, Nevada, USA Hot!
Mobile Maintenance Mechanic, Alaska, USA Hot!
Mine Geologist, Alaska, USA Hot!
Senior Mine Engineer - Long Term Planning, Alaska, USA Hot!
Senior Mine Engineer, Chicago, IL, USA Hot!

 
Coeur Alaska, Kensington Gold Mine