Hide this alert

The Pogo gold mine is located 145 kilometres southeast of Fairbanks, Alaska. It is an underground mine that utilizes a cut and fill drift method. The mill treats 2,500 tpd to produce 1,000 ounces of gold per day. The milling operation includes grinding, sulfide flotation, paste thickening, Leach/CIP, cyanide detoxification, tailings filtration, a paste mix plant for underground paste backfill, water treatment, and gravity recovery.

Please Visit our booth in the Online Job Fair


Wednesday, October 22, 2014
Chief Mine Engineer, Fairbanks, Alaska, USA

 
Stay Informed with CareerMine News and Alerts