Operations Manager
| Resume ID: |
5492 |
| Industry Experience: |
20 years |
Education Level: |
College |
| Will Travel: |
Yes |
Will Relocate: |
Yes - International |
| Languages: |
Spanish, English |
CitizenShip: |
Peru |
| Salary Range: |
$15000 USD / month |
|
Contact Details
This candidate has elected to have his/her contact details hidden at this time.
You may contact the candidate via the Resume Tools on the right.
Candidates hide their contact information for many reasons. Among them are privacy and security.
Careers Summary/Objective
Areas of Expertise
-
Mining Production
»
Production Engineer
»
20
years
-
Marketing & Commercial
»
Product Representative
»
4
years
-
Management & Administration
»
Other
»
5
years
Highlight
Senior Professional in Mining Engineering; Specialist improvements and growth in the mining sector production and trade. Creative challenges of management, leading the influence and development in various operations teams in Mexico, Peru, Congo and Zambia, as in projects in Argentina, Bolivia, Colombia, Chile and Ecuador with South Africans Companies. Highly specialized in generating indicators of profitability.
• Time and motion studies
• Strategic Planning mineralized bodies
• Underground Mining
• Professional development and training.
• Leadership and Negotiation
Education Details
Graduate Management Mining (UNI Ongoing since 2007-II)
Engineer entitled mines of the National University of Engineering
IPC Registration No.: 83712
Management fluid language (written and spoken: English, Spanish, Latin).
Communication basics: Quechua, Isawilli, Africans.
Certification & Short Courses
The Engineers´Registration Board of Zambia
Registered Engineer: Philipps Jaramillo Guillermo Enrique. Field: Mining Engineering. College: NC5 Category: Degree. EngRB N°.: 003587. Year: 2010.Buildings Department HQ. Fairley Road, Ridgeway. Lusaka, Zambia.
Blasting Licence Republic of Zambia. The Explosives Regulations. (Regulation 804 (6)) N°. MSD N° 0010185
This is to certify that Philipps Guillermo is licensed to conduct blasting operations of the following category: ALL MINING OPERATIONS. Date of issue: 08/09/2010
Validity of Permit 036665. This permit shall, unless sooner revoked, be valid until: 21-06-2011. G.R. N° 0303751 Date: 13-08-2010. File Reference: H/Q P.0776110. Full Names of Holder: Philipps Guillermo Place of birth: Lima-Perú. Natinality: Peruvian. Ocupation: Underground Manager. Name of Employer: Mopani Coopermines PLC Address of Employer: P.O. Box 22000, Kitwe.

Experience
Visit to put in Operations Open Pits in Zambia: Kalaba and Zebesha Mining January 2011.
MOPANI COOPER MINES PLC – August 2010-December 2010
Underground Manager North Shaft.
Production of: 30298 Tons. With 1.72% Cu and 520 Tons. of Net Cooper
Our Underground Mining Method is Room and Pillars
We use Contractors:
Fronts to advance along the direction of the mineral as well as cross cuts 11 m. of distance between them. Cross Cuts usually take place until hanging wall to the footing wall. (The progress of the Drive we call Phase I, and progress in the Cross Cuts we know as Phase II).
Once defined the hanging wall and the footing wall. Proceeds to enhance the cross cut to have a length of approximately 15 m. in the same direction of dip of the mineral. For this process works we retreat from hanging wall to footing wall. After every blasting we use to put roof bolts with cement to support. The gallery between the Cross Cuts we put cable bolting 4 m. long All this process is known as Phase III.
To load the ore or waste from these developments is done with company´s equipment with its own operator. The intention is reduce the cost per meter of advance.
Except in the bottom where the Contractor also uses their equipment to load at a distance of 250 m. only.
We have another Contractor to do the maintenance of the railway in the 1380 Level where the locomotives move ore or sometimes waste. (Length about 4 kms)
Mopani
We have people from the Company to:
All equipments to load are from Mopani. We have Caterpillar 1300 and Sandvik Toro with the same capacity. And two dump trucks from Sandvik with 16 Tons. Of capacity.
Similarly the transport of ore locomotives are made with company equipment and their operators.
The infrastructure of air, water, electricity, ventilation is provided by Mopani.
As for the entry and exit of personnel inside the mine is done by a Shaft of 420 mts. Deep.
Finally, to get a low-profile from surface to inside the mine or viceversa has a ramp that starts from the open pit and allows entry to the level where the workshop to 366 m. depth in a short time.
During my tenure I suggested that operators be trained in the handling and care of the scoops and trucks, low profile by the continuous deterioration that had such equipment due to lack of expertise in management. In the case of the trucks were frequent power cuts for not giving a good radius of curvature during operation, causing the power cut to the detriment to the Jumbos, Pumps, Fans.
Underground Manager SOB Lower Levels from 3140 Afold and Sync to 3435 Sync.
Production of: 65,386 Tons with 1.84% Cu and 1,131 Tons of Net Cooper.
Our underground mining method is Sublevel Caving.
We use Contractors:
To drill the holes in the rings and the rigs with Long Holes Machines like Simba in the Ore Bodie. The total quantity of meters that we drill with the Long Hole Drill Machines is 19,000 meters/month to get 160,750 Tons.of ore.
To prepare the Cross Cuts from the footing wall to the hanging wall and to prepare the Drives in the same direction that the Ore Bodie has. The machines that the Contractors use are: Jumbos and Loaders.
To prepare the Slot Raises in the intersections with the Cross Cuts and the Drives, the Contractors use jackhammers
Mopani
We have people from the Company to:
Primary blastings in day shift only. In some cases with 14 holes we can produce around 1400 Tons per blasting/shift.
To move the ore and waste we use Cat 1300 and Cat 1600 Loaders. And when the distance is more than 300 m. we use Dumptrucks Cat AD 30 and AD 45 to put on the ore tips or waste tips.
Finally the ore arrives to the Shaft with 4 Locomotives with 5 mining cars of 7.2 Tons of capacity every one.
The distance to move is 2.5 Kms.
We move the ore or waste at surface the capacity of every skip is 12.5 tons. And we use 2 skips in a vertical distance of 1260 meters. At the moment we can hoist 357 Tons/hour.
Diesel Locomotive move the ore at the Concentrator 500 Tons/trip with 10 cars.
The capital development is 168 meters/month and the secondary development is 594 meters/month.
Our cost was US $35/Ton of ore. Our performance is 6.34 Tons/man-shift.
? GENERAL SERVICES SRL MALON - July 2010
Advisor for Open Pit Mining Projects: Michiquillay, La Zanja, and Toromocho from Chinalco.
AAC MINING LTD EXECUTORS: Kamoto Mine - DR Congo, Africa-December 2009 - June-2010
Operations Manager
Production Increase education campaign through the use of low-profile teams both drilling and hauling and transportation, support equipment with pneumatic injection pumps, installed all the necessary infrastructure to advance mine workings that would have other blocks of mined.
Peruvian staff training is beneficial to be multifunctional since the mining culture in this country is that every person has a specific function only. Peruvians who live there are Jumbo drillers, scoop´s and dumptruck operators, assemble the network of auxiliary services mine.
One of the most important action that we did was the use of the Shotcrete Robot Machine. We can advance 6 meters per hour with Shotcrete when the section is 6 meters by 5 meters.
San Valentin Mining Company -August 2008-June 2009
Compania Minera Los Chunchos (Units: Don Mario, Black Heralds and Santa Elena. Operations Manager.
During the crisis of mineral prices between September 2008 to June 2009
I got several objectives:
I made mine mineral campaigns. At first it was the treatment of ore: Don Mario, Black Heralds, Santa Elena and San Valentín separately. Then to use the installed capacity of the concentrator plant was set up a 20-day treatment of ore x 10 days stayed. What enabled TMS to produce up to 120 per day Zinc Concentrate, when the law at least tried to keep head in 6% Zn.
Unity Santa Elena (Bethania)
I proposed to add another mine called Santa Elena (Bethania) to extract high-grade ores of silver and lead and be able to obtain concentrates with higher added value.
I established that all work Operating, exploration, progress, development and exploration were made with specialist companies.
I managed to instill that drive the concept of generating profit margin / Mining Unit.
Don Mario mining unit
It ended extend the Ramp to 4270 m Level at 5 m. x 4 m.
Our aim is to save about U.S. $ 10,000 per month for the rental of a low-profile truck 16 tons of capacity that was used in the intermediate transport ore to surface.
Optimize Supply Water for Drilling Diamond Drilling Machines, we used a track to move water in the beginning but finally we move the water by gravity from 4.412 m altitude workplace LM Machine 75.
Black Heralds Unit
Develop a plan to reduce costs by optimizing the use of water resources and stop eating for 02 diesel electric power generation. The project involves the laying of high voltage line from 33 KV to Mina Saint Valentine to Black Heralds Mine. The projects that are feasible is available Llapay Hydroelectric Plant with a capacity of current generation of 3.2 MW and with an expansion project to 4.2 MW. Used only 1.5 MW. The benefits are: Power supply to the TMD 350 Concentrator Plant, power for the network of the mine. Therefore reduce the costs of purchasing diesel fuel 02 that is used in generators.
This project to conect the power from Llapay´s Hydroelectric was finished at December 22th, 2010.
ICM Pachapaqui Mining Company March-June 2008
Operations Manager
Dimensioning the ore body (Ore. Bodie).
Design of open pit (Open Pit).
Environmental Impact Study and the study of geomechanics slope stability of open pit.
It was made ready to operate the concentrator to 15,000 TMS / month.
Adapt flotation circuits for the treatment of old tailings.
Continue automation of five Francis turbines in the two hydropower plants.
Huallanca BHL MINING GROUP COMPANY SA -April-December 2007
Manager Mining Operations Units and Contonga Pucarrajo:
Pucarrajo Mining Unit:
Develop Project for the implementation of the method of sublevel (sublevel stoping), to underground mining machine and reduce production costs, as well as increasing productivity, reducing the dispersion of the work (Having too little work scattered volume).
Coordinate exploration projects: Pucarrajo-Carmen Elisa Cuthbert, and Monica of the mineralized bodies. Santa Formation. Since it is justified for new horizons in the medium term.
I participated in the advance of the proposed interconnection of the Power Station Sub Pucarrajo Huallanca up, which was designed to completely eliminate the use of petroleum diesel generators. Whose value in U.S. $ / kWh is almost three times the value of which is generated from hydropower.
I started work on the increase and the construction of the dam Relavera foot of the Oasis.
Prepare the stage for increased production of mineral TMS 24,000 / month TMS 30000 per month in the mine area, as well as in the concentrator.
Contonga Mining Unit:
Make the Project to improve the platform that instills VASS Team Consulting, as regards innovation as of January 2008, in the care of the food with Sodexho.
Prepare the stage for increased production of mineral 14 500 TMS / TMS months to 21000 per month in the mine area as well as in the area of the concentrator for the year 2008.
I supported the separation of copper-silver as a third type of concentrates for sale. It was working to reduce the amount of active zinc.
It improved the ventilation of the mine with the construction of four Raise Borers.
CORMIN MEXICO COMPANIES Trafigura Group Mine and Mount El Carrizal -December 2004 to February 2007
Operations Manager
Participated in Project Pumping water from the mine to El Carrizal San Francisco Concentrator Plant. Length: 7.5 km. The aim was to cover the deficit of water needed for the expansion of production in the TMS 60000 Concentrator / month.
Take the assessment of the site of mines, El Carrizal and El Monte (State of Hidalgo).
I performed the evaluation of low-profile equipment acquired by Minera Peñoles New Monte, and gave recommendations on the type and availability of equipment in order to achieve the production of ore concentrates and programmed.
Developed Assessment Concordia orebody, located in the vicinity of Zimapán Shaft . In the El Monte Mine El Monte, for inclusion as an additional input of production in the years 2006 and 2007.
I made the DOR (Dayly Operations Report) from New Mining Unit SA de CV Monte that shipped worldwide.
The rate of production of concentrates in February 2007 was in the range: 484 TMS Lead-Silver Concentrates, 2232 TMS of zinc concentrate and 281 DMT of copper-silver concentrate.
Mining Company San Ignacio de Morococha (San Vicente SIMSA-Unit)-April 2003-September 2004
Operations Manager
Put into operation a program of replacing the operating areas, in order to maintain a minimum monthly production of zinc concentrates from 4300 TMS / TMS 5200 month / month for the years 2003 and 2004, respectively. For this it was necessary to undermine the recovery areas of rooms and pillars located in the northern and southern zones of the reservoir. Occurred in this sector during 2003: 52 588 DMT of ore with a grade of 13.94% zinc.
52.469 With the production of zinc concentrates TMS (TMS 4372.42 per month on average) in 2003 and 47.478 of zinc concentrates TMS (TMS 5275.33 / month) to September 2004, we were able to operate the equipment fleet which had been dismantled Aynamayo workshops.
To operate the company's own equipment as 6 yd3 and 3.5 yd3, Electro hydraulic Jumbo H-126, Tractor D8-L, Moto grader, front loader and reduce costs to eliminate the use of rented equipments.
MASTER DRILLING PERU SAC. April 1999-March 2003
Project Manager.
Master Drilling I managed to grow in Peru SAC Peru and Latin America.
Planning activities for more drilling contracts with machines Raise Borer in Latin America. Comply with Visitation Program Underground Mine north to south in Peru. Meet evaluating the use of machinery that had Raise Borer Robbins Industrial Services SA de CV Peñoles its mines in Mexico: Bismark, Naica, Fresnillo, Guanajuato, Tizapa. Based on this visit the decision to use their machines Robbins or use Master Drilling Machines with unit prices, but with better perfomance. Priority 1: to obtain more contracts for drilling in Peru.
I developed a business plan and cycling of the start and end dates of the contracts of the Machines Raise Borer, as well as bars and parts nationally and internationally to maintain a pace of sales of $ 3.5 MM / year.
Skills
PowerPoint, Outlook, Internet
Text Processing: Microsoft Word
Spreadsheets from Excel
Facility to learn languages
Dealing people
|
You are in the
Employers
section
Inspirational Thought
"You know everybody is ignorant, only on different subjects."
- Will Rogers
|