ADAMANSO (INTER-AFRIQUE)
|
|
Key Facts
New to Company & PropertyMine?
Start Here » Comparable Properties
|
Latest Information October 31, 1997 173 m of hand trenching was completed. Values included 1.2 g/t Au over 21 m and 5.5 g/t Au over 2.5 m. The three gold -bearing systems (Adit, Middle and Lost reef systems) on Pampé-North appear to converge to a single vein/shear system 1.5 km to northeast in the Kitiki Hill area on the Inter-Afrique concession. October 31, 1997 173 m of hand trenching was completed. Values included 1.2 g/t Au over 21 m and 5.5 g/t Au over 2.5 m. The three gold -bearing systems (Adit, Middle and Lost reef systems) on Pampé-North appear to converge to a single vein/shear system 1.5 km to northeast in the Kitiki Hill area on the Inter-Afrique concession. October 31, 1996 A program of regional geochemistry had been initiated. To be followed by detailed soil sampling. Satellite imagery and data from the regional Aerodat airborne geophysical survey was being obtained to assist in the interpretation of the underlying bedrock geology and structure. |