Reported that gaton completed wide spaced drilling program of 65 holes for 3341m over the of its postulated phosphatic greensand horizons at Dandaragan. Hole S2 intersected 6m @ 5.16% P2O5 from 10m.
September 30, 2008
Sesimic lines and a first phase 1 of reconnaissance drilling were completed on two east-west lines of across the southern and central sections of the Dandaragan fault domain. Hole P01B intersected 9m @ 7.7% P2O5 from 26m.