June 30, 2008
A limited programme of field sampling was commenced. Results were received from the 30 rock chip and159 trench samples collected in May. There are 7 gold values over 1g/t Au (maxima of 17.8, 5.85) and 11 over 0.1% Cu (maxima of 0.45%, 0.45%). The historical data on the project has been acquired and is currently being reviewed to determine whether any of the +26 holes drilled to date could have missed mineralisation at depth. An allowance has been made in the budget to drill test any new theories.