ALTAR - MEXICO
|
|
Key Facts
New to Company & PropertyMine?
Start Here » Comparable Properties
|
Latest Information February 28, 1999 Second phase drilling was to commence on the Sierra Pinta prospect. The first target type was to include follow-up and offset drilling of mineralized drill hole intercepts encountered in several holes during 1998. A second target type would test exposed areas of the geochemically anomalous Mohave-Sonora Megashear breccia that is over a km in width at Sierra Pinta. The third target type was a large geophysical anomaly (2 - 3 sq km) similar in size and shape to the expression that contains the nearby La Herradura deposit. February 28, 1999 Second phase drilling was to commence on the Sierra Pinta prospect. The first target type was to include follow-up and offset drilling of mineralized drill hole intercepts encountered in several holes during 1998. A second target type would test exposed areas of the geochemically anomalous Mohave-Sonora Megashear breccia that is over a km in width at Sierra Pinta. The third target type was a large geophysical anomaly (2 - 3 sq km) similar in size and shape to the expression that contains the nearby La Herradura deposit. November 30, 1997 21 reverse circulation drill holes, for a total of 2,969 m, were completed on the Pavo Real prospect. No significant results were reported. Drilling was also conducted in the Panchita area. A total of 750 m of drilling was completed; 4 of the 5 holes contained anomalous gold values. |