A total of 19 holes for 1,856m were drilled across the central part of the Orange Creek Syncline on 400m spacings with significant uranium mineralisation intersected across the centre and southern side of the syncline at depths of 30-40m. A second area of broadly spaced drilling, 12 holes for 1,250m intersected uranium mineralisation on the regional redox boundary, a further 9 km to the southeast in a section of the Orange
Creek Syncline that had not previously been tested by drilling. Significant results include hole AMRC 015 returning 0.55m at 344 eU3O8 ppm, hole AMRC 016 retuning 1.00m at 926 eU3O8 ppm, hole AMRC 017 retuning 0.55m at 288 eU3O8 ppm, and hole AMRC 030 retuning 0.75m at 349 eU3O8 ppm.
June 30, 2006
New exploration licence granted. Orange Creek Prospect, uranium mineralisation in
sandstone. Historical drilling results include; 3.40m @ 413ppm eU3O8, 1.25m @ 421ppm eU3O8 and 0.45m @ 864ppm eU3O8.
March 31, 2006
One exploration licence granted. Orange Creek Prospect, uranium mineralisation in sandstone. Historical drilling results include; 3.40m @ 413ppm eU3O8, 1.25m @ 421ppm eU3O8 and 0.45m @ 864ppm eU3O8.