September 8, 2005
Planned to reevaluate the targets within the prospect area identified by Rio Tinto.
In 2002/2003 Rio Tinto completed a two-staged drill program consisting of 15 widely-spaced holes, of which the most encouraging results include:
• AM-01: 317.80 m @ 31.7 g/t Ag, 0.11 g/t Au
• AM-02: 100.25 m @ 1.11% Cu, 0.16 g/t Au, 19.55 g/t Ag
• TQ-02: 26.8 m @ 2.6% Cu, 0.42 g/t Au, 45 g/t Ag