Reported that a program of trenching and sampling is planned for the 2006 season.
In July 2004, reclamation work was carried out and additional prospecting has extended the length of the known silver-lead vein to about 400 meters.
January 31, 2004
Assay results from drilling were received. Four of the five diamond drill holes totalling 800 meters targeted coincident induced polarization and multi-element geochemical soil anomalies. The four drill holes encountered weakly altered, quartz monzonite mineralized with disseminated pyrite +/- chalcopyrite +/-molybdenite veining over intervals of up to 60 m. However, no significant molybdenite, copper or silver values were returned.
September 30, 2003
Initial 800 m (5 holes) diamond drill program completed - results are pending.