Drilling of 6 holes totalling 804 m did not intersect economic mineralization, but the drilling cut phyllic alteration (typically on the outer edge of a system) containing minor amounts of chalcopyrite and chalcocite as well as gold values as high as 0.775 g/tonne and 1.92 g/tonne gold.
August 31, 1993
A total 27,000 m of drilling in 66 holes had been completed on the property. The drilling identified a copper-gold-molybdenum mineralization measuring 1,100 m north-south and 1,500 m east-west.
July 31, 1993
An IP and magnetic geophysical survey was completed on the property.