|
Property NewsAugust 31, 1994 A 4,300 m, 21 hole, drill program was completed to test targets resulting from 1993 trenching. December 31, 1993 Trenching was completed on the Main Zone. The best result received was 1.76 g/t over 58.0 m in trench 11E. October 31, 1993 Trenching of the Main zone returned 73.5 m of 0.732 g/tonne gold and several similar results.
|