|
Property NewsMarch 31, 1999 It was reported that to date, the exploration results on the properties have been disappointing and that costs associated with the project were written off.
During winter 1997/98, a second drilling program (1,520 m in 9 holes) confirmed the presence of Ni-Cu-Co mineralization on the Lac Berthe property. Assays up to 1.10% Ni and 0.5% Cu were recorded. March 31, 1999 It was reported that to date, the exploration results on the properties have been disappointing and that costs associated with the project were written off.
During winter 1997/98, a second drilling program (1,520 m in 9 holes) confirmed the presence of Ni-Cu-Co mineralization on the Lac Berthe property. Assays up to 1.10% Ni and 0.5% Cu were recorded. September 30, 1996 The Phase 1 program was completed. Phase 2 exploration consisting of stripping, trenching, blasting and sampling with detailed ground EM was underway; to follow with diamond drilling.
|