Stream sediment samples produced peak values of 261 ppm copper, 1203 ppm zinc, 97.7 ppm lead and 0.27 ppm silver. Gold was in the range <1ppb to 4 ppb with a single result of 30 ppb gold.
July 24, 2007
Stream sediment geochemical sampling was underway with initial results expected in Aug/07.
December 31, 2006
No work was completed on the project area during the reporting period.
Work completed here by WMC (1967-1975) defined a number of copper-in-soil anomalies (>1000ppm copper)
on the northern limb of the anticline. There is no record of these anomalies having been drill evaluated as of Dec 31/05.