August 25, 2010 Panoro Minerals announced the assay results from the third and last batch of samples of nine drill holes from the 2010 infill drilling program at the East Block at the Antilla Copper Molybdenum Project in Peru. Results include 45.10m at 0.73% copper and 0.003% molybdenum from 11.20m downhole in ANT-84 including 20.00m with 1.07% copper and 0.003 molybdenum from 28.00m and in Hole ANT-81 returned 32.00m at 0.73%copper from 34.00m depth.