April 29, 2006
Three holes were completed in late 2005, totalling 1,200 m. One hole targeted the Gozgor prospect, and the other two holes targeted the Ovoot prospect. Highlights of the drilling include: 2.7 m grading 0.70 g/t Au and 1.75% Cu from 87.7 m in hole 2005-01 and 53.0 m grading 0.48% Cu from 23.7 m in hole 2005-03.