March 5, 2007
Provided drill results on the Storsjo uranium project located in central Sweden. The program to drill test a number of geophysical targets on the Solvbacktjarn 100 claim was undertaken and completed in February, 2007. Ten targets were drill tested with holes averaging 75 metres in length. The most significant interception was cut in hole No. 06-04 in which 1.1 per cent U3O8, 0.91 per cent copper, 48 grams per tonne silver and 0.25
per cent nickel were intersected over a width of 0.95 metre.