Section of diamond drill core from DelDDH09 at Deloraine
April 8, 2011
Maximus Resources Limited reported that chalcopyrite mineralization was intersect from its diamond drill hole DelDDH09 starting from 216.2 metres down to 267 meters at its Deloraine gold prospect in the Adelaide Hills, South Australia.
Maximus Resources announced assay results for the first two holes drilled by the company’s at its wholly owned Deloraine gold prospect in the Adelaide Hills, South Australia. The deeper Hole No. 2 was designed as an extensive depth step out to determine if mineralisation persists at depth, and targeted a position approximately 150 m to 200 m beneath the historic working. Results from this hole included an intersection of 3 m at 30.3 g/t Au.
Reported that hole BH-44 was completed at a total depth of 460 metres being some 60 metres below the previous deepest Bird in Hand hole, BH42. On visual inspection, the core includes a 7 metre interval from 410 metres that contains visible gold specs within quartz veining.