The company submitted and EIA involving the mining of an oxides-copper deposit and the construction of a 14,000 t/y-capacity plant of Pentahydrated Copper Sulphate with 25% purity. The mine life of the deposit was estimated in 10 years to be exploited by means of Sublevel Stopping method with an approximately rate of 850 t/d.