Received the drill results. The results of the short program failed to show any depth extent to the surface gold geochemistry. The best intervals in holes 1 and 2 were 2 metres of 2.6 g/t Au and 0.3% Cu and 2 metres of 2.27 g/t Au and 0.6% Cu. No immediate work on the concession was planned.
December 31, 2003
Received the drill results. The results of the short program failed to show any depth extent to the surface gold geochemistry. The best intervals in holes 1 and 2 were 2 metres of 2.6 g/t Au and 0.3% Cu and 2 metres of 2.27 g/t Au and 0.6% Cu. No immediate work on the concession was planned.
September 30, 2003
Commenced drill program on project. The drill program consisting of 500 m will test a number of the targets, with a view to defining firstly the presence, and secondly, the depth extent of apparently replacement style, flat lying mineralization as a source of the soil and rock geochemical anomaly. Minmet expects full results and assessment to be
available by the end of November.