The exploration program in spring 2007 will use different geophysical survey methods to the
magnetometer and HLEM surveys used to date. A ground penetrating radar (GPR) and/or seismic method will be conducted at the head of the indicator trains which may help to locate the kimberlite sources to the indicator dispersal trains.
September 14, 2006
During the year, a drill program of six drill holes to test two geophysical and two geochemical anomalies in the West Munn, Munn Lake Sill North and North Margaret train areas was completed between July 20 and Aug. 1. A total of 798.6 metres was drilled. Kimberlite was not intersected.
November 2, 2005
Annnounced that the completion of the laboratory geochemical analyses of the MMI samples is imminent however the data will require detailed interpretation.
In 2005 one geophysical target was drill tested with negative results. The geophysical program included 76.59 line-km of magnetic and HLEM ground geophysical surveying. Sampling included the collection of 85 till samples and 726 geochemical samples for MMI (Mobile Metal Ion Method) analysis.