An 18 hole drilling program was completed. A total of 584m of vertical aircore was drilled to an average depth of 32m and ranged from 5-65m in depth.
September 30, 2007
Four metre composite samples were taken for the entire length of all holes drilled. These were submitted to ALS Laboratory for uranium analyses using the XRF analytical technique.
March 31, 2007
Completion of a ground spectrometer survey and MMI geochemical soil survey over
four priority targets.