Global InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps Software
Investment Commodities Properties Equipment Consultants EduMine Technology Events InfoMiner
Charts & Data Mine Sites Mine Costs About Contact eStore Advertise Subscribe MINING.com
SITE SEARCH

BADU

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
*PLEASE NOTE*
THIS RECORD HAS BEEN ARCHIVED AND IS NO LONGER BEING UPDATED.
THIS INFORMATION HAS BEEN LEFT FOR HISTORICAL RESEARCH PURPOSES.
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
BADU
Classification: Archive
Status: Exploration
Type of Work: Surface
Location: China, Guangxi
  • Property Map
Research - Professional or Research - Advanced Subscriber Access Required
Subscribe Today


Property News

November 30, 2004
All assay results have been received from the recently completed RC drilling. The highest intercept received to date at Badu assayed 4.2 g/t gold over a width of 13 metres. These results are consistent with surface sampling conducted in the region, in proximity and at a distance from known mine workings. Widely spaced reconnaissance drilling to date has only been conducted within one mineralized corridor at Badu of which there are several on the project remaining untested. Almost all of the remainder of the drill holes intersected zones of highly anomalous (0.25-0.5g/t Au) gold mineralisation.
November 30, 2004
All assay results have been received from the recently completed RC drilling. The highest intercept received to date at Badu assayed 4.2 g/t gold over a width of 13 metres. These results are consistent with surface sampling conducted in the region, in proximity and at a distance from known mine workings. Widely spaced reconnaissance drilling to date has only been conducted within one mineralized corridor at Badu of which there are several on the project remaining untested. Almost all of the remainder of the drill holes intersected zones of highly anomalous (0.25-0.5g/t Au) gold mineralisation.
September 30, 2004
First pass reconnaissance drilling programme was completed. A total of 23 shallow widely spaced reverse circulation drill-holes were drilled in a variety of structural targets along an identified controlling structural feature some 3 kilometres long in the Badu area. Of the 23 holes, 4 were abandoned due to poor ground conditions and preliminary assay results have been received for 17 holes (2.14 g/t Au over 8 meters; 1.89 g/t Au over 4 meters and 1.79 g/t Au over 4 meters). The results have confirmed the bulk-mineable disseminated gold potential of the property. Results from 2 holes are pending.
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish