Global InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps Software
Investment Commodities Properties Equipment Consultants EduMine Technology Events InfoMiner
Charts & Data Mine Sites Mine Costs About Contact eStore Advertise Subscribe MINING.com
SITE SEARCH

BAIA MARE

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
*PLEASE NOTE*
THIS RECORD HAS BEEN ARCHIVED AND IS NO LONGER BEING UPDATED.
THIS INFORMATION HAS BEEN LEFT FOR HISTORICAL RESEARCH PURPOSES.
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
BAIA MARE
Classification: Archive
Status: Exploration
Type of Work: Surface
Location: Romania
  • Property Map
Research - Professional or Research - Advanced Subscriber Access Required
Subscribe Today


Property News

October 27, 2005
Carpathian Gold has announced the results from three core drill holes recently completed on the Baiut Project located in northern Romania. Highlights include drill hole BBD-4 which intersected 18.35 m grading 6.07 g/t Au (from 30.80 m) including 4.00 m grading 23.36 g/t Au (from 43.00 m) and drill hole BBD-5 which intersected 10.60 m grading 4.22 g/t Au (from 61.50 m) including 5.60 m grading 7.19 g/t Au (from 61.50 m). The objective of this drill program on the Baiut project was to determine the width and grade of a subvertical vein structure and associated stock work zone which had never been tested by drilling.
October 27, 2005
Announced the results from three core drill holes recently completed on the Baiut project. Highlights include drill hole BBD-4 which intersected 18.35 m grading 6.07 g/t Au (from 30.80 m) including 4.00 m grading 23.36 g/t Au (from 43.00 m) and drill hole BBD-5 which intersected 10.60 m grading 4.22 g/t Au (from 61.50 m) including 5.60 m grading 7.19 g/t Au (from 61.50 m). The objective of this drill program on the Baiut project was to determine the width and grade of a subvertical vein structure and associated stock work zone which had never been tested by drilling. The two core holes from this first pass drilling program intersected the vein structure and stock work mineralization at a depth of approximately 30 to 40 m below surface. The results indicate that the gold mineralization is continuous over the intersected intervals with true widths in the metres, which includes vein zones of higher grade gold mineralization. On the Jereapen licence hole JDD-5 intersected 1.00 m grading 112.00 g/t Au (from 34.00 m). This drill hole targeted the near surface expression of one specific vein in a previously un-drilled vein swarm with known historical production from underground workings. The Corporation is also drilling on its 100% owned Oravita Exploration License in southern Romania and results will be forthcoming.
June 23, 2005
Announced the results from metallurgical testing of two samples collected from the Baiut gold resource project returned 95.3% and 93.0% gold recovery using bio-oxidation followed with conventional cyanide leach technology on sulphide concentrates.
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish