Four high-priority targets were identified in the area, all located at Gaolong Dome, within five kilometers of one another. Three of these prospects are currently in production as small scale heap-leach mines, the fourth is the Jigongyen Mine.
The JV planned to complete a 12 month detailed due diligence program on the property, carry out extensive reverse circulation and diamond drilling, re-calculate the existing ore reserve and carry out a feasibility study to include engineering and design work on the property.
May 31, 1998
Four high-priority targets were identified in the area, all located at Gaolong Dome, within five kilometers of one another. Three of these prospects are currently in production as small scale heap-leach mines, the fourth is the Jigongyen Mine.
The JV planned to complete a 12 month detailed due diligence program on the property, carry out extensive reverse circulation and diamond drilling, re-calculate the existing ore reserve and carry out a feasibility study to include engineering and design work on the property.