A new zone of massive sulphide mineralization was intersected. The new zone was about 1.5 km east of the old mine workings. See microfiche C3292 A20 for drill results.
August 31, 1993
A new zone of massive sulphide mineralization was intersected. The new zone was about 1.5 km east of the old mine workings. See microfiche C3292 A20 for drill results.
November 30, 1992
Hole 92-10, drilled 660 m vertically below surface and 260 m below the bottom level of the old mine workings, returned 4.49% lead, 6.22% zinc and 253.7 g/t silver over 7.2 m.
4 diamond drill holes in 1990 did not cut mineralization.