Compilation of data has resulted in the definition of targets for nickel sulphide mineralisation at the
Beasley Creek project, which contains extensions to ultramafic rocks hosting nickel gossans on adjoining competitor owned tenements.
September 30, 2005
Some 97 RAB holes for 2967 metres were drilled at the Bullfrog and Blue Drum North prospects to assess elevated gold values (maximum 299ppb Au) detected by a soil sampling program completed in 2004. Composite gold assay results from the drilling returned a maximum value of 4 metres @ 210ppb Au.
June 30, 2005
RAB drilling at the Bullfrog and Blue Drum prospects commenced late in the quarter. A total of 83 holes for 2745 metres have been drilled to date, with assays awaited. Additionally, 53 rock chip samples and 36 stream sediment samples were collected on the Beasley Creek tenement. Results from 34 rock samples received include several anomalous gold values.
During the Sept quarter/04, a reconnaissance field work program commenced with a program of stream sediment and soil sampling over a number of target areas to commence in October 2004. Airborne hyperspectral data was acquired will be reprocessed and interpreted during the upcoming quarter.