September 30, 2008
Initial drilling of three holes was completed at the Sino Gold Alliance joint
venture Bengge project with Sino Gold Mining with the fourth in progress. An intersection was returned from hole SGB003 with 18 m at 3.92 gram per ton gold from 42 m including 9 m at 7.6 grams per ton gold.