BOUGOURIBA (MANDIASSO & DIOSSO)
|
|
Key Facts
New to Company & PropertyMine?
Start Here » Comparable Properties |
Latest Information December 11, 2007 Begins 4,500 m of infill drilling begins at the Kuérédougou Prospect, Mandiosso-Diosso licenses. November 14, 2006 Provided the results from its initial drill program. Mineralization was found within the sheared volcanic rocks or at the sheared contact of the sediments. Depth of the alteration varied from zero to 15 metres in the sheared volcanics and to over 60 m in the sheared sediments. Significant results include hole MDRC002, cutting 10 m at 4.74 g/t Au from 76 m and hole DSORC001, cutting 4.82 g/t over 6 m from 49 m. May 23, 2006 Announced results of surface grab samples at Gassel Garafo, Mandiasso and Diosso. Mandiasso results included 82 individual samples the total average of which was 4.1g/t Au. 44% of the results were above a 2g/t cutoff, and 66% were above a 0.5g/t cutoff grade. |