|
Property NewsNovember 29, 2010 YAMANA GOLD INC. announced updates on several of its properties, to include; Mercedes, Mexico - Expansion of the new Diluvio zone within the Lupita vein system and extension of the Lagunas zone, a bonanza grade area in the Barrancas vein system. Pilar, Brazil - Deposit continues to be open along strike and down dip with a further down dip extension that almost doubles dip length from 450 to 850 metres. Fazenda Brasileiro, Brazil - Increase in size and confirmation of continuity of the Lagoa do Gato deposit and CLX2 deposit. December 15, 2008 Yamana has indicated that it would not make construction decisions until at least mid 2009, pending a review of anticipated cost improvements and metal prices. June 30, 2008 A construction start-up was approved and production is projected for early 2010.
|