A 3 hole drill program had been completed on the property. Assays were pending.
In 1997, a total of 22 drill holes were completed. Four of the drill holes intersected gold concentrations ranging from 0.5 to 3.5 oz/t gold over a minimum width of 2 m.
Surface exploration followed by a limited drilling program was completed in 1996. 2 of the 5 drill holes intersecting high grade gold mineralization.
Previous work included 8 drill holes. 3 separate high-grade structures were intersected.
December 31, 1998
A 3 hole drill program had been completed on the property. Assays were pending.
In 1997, a total of 22 drill holes were completed. Four of the drill holes intersected gold concentrations ranging from 0.5 to 3.5 oz/t gold over a minimum width of 2 m.
Surface exploration followed by a limited drilling program was completed in 1996. 2 of the 5 drill holes intersecting high grade gold mineralization.
Previous work included 8 drill holes. 3 separate high-grade structures were intersected.