Four drill pads will be constructed (with one or two drill hole(s) per pad) targeting gossans and massive pyrrhotite with lesser pyrite, galena and trace amounts of chalcopyrite in limestone on the Wells-Barkerville mine trend. The stratigraphy, lithology and structural settings appear to be similar to that hosting the Mosquito Creek and Island Mountain replacement deposits.
March 31, 2005
Anomalies identified on the Cariboo Gold Project 2003 soil grids were followed up with rock chip sampling, supplemental soil sampling, and geological mapping.
November 17, 2004
Drilling underway near the confluence of Cunnigham Creek and Peter's Gulch Creek. To date seven holes have been completed of the twelve holes planned in the first phase of drilling.
No work was carried out in 1997.
In 1995 and 1996, a program of geological, geochemical and geophysical surveys, trenching and drilling was carried out on the property.
In 1987, a total of 1,098 m of drilling in 12 holes were completed.
In 1986, a total of 2,327 m of drilling in 18 holes were completed on the property.