|
Property NewsApril 30, 2007 The Company drilled fifty-four RC holes and nineteen core holes in drill campaigns carried out in 1994, 1995, 2003, and 2005. The Company has drilled about 82% of the footage at Cashin; about 38% of the total footage is core. February 28, 1995 New reserves based on 1994 and earlier drilling were released. A 700 m strike of the Cashin fault and widths up to 150 m across were used in calculating 6.1 m bench composite blocks. The resource was open in 4 directions. November 30, 1994 A 600 m strike had been tested by 10 drill holes which returned an average 0.65% copper and 47.9 m thickness.
Around 1969, a 43 hole, 1,335 m drill program was completed.
In 1946, underground production of high grade ores ceased.
|