Property News
September 30, 1996
50% of the prospects and mines in this area have been field checked. 8 areas were identified which have geological potential of over 50 Mt ore in Paleozoic volcanics. A soil geochem grid has been constructed on one target. Ground EM surveys and a 3100 line km airborne survey have been done and target testing by drilling will follow.
September 30, 1996
50% of the prospects and mines in this area have been field checked. 8 areas were identified which have geological potential of over 50 Mt ore in Paleozoic volcanics. A soil geochem grid has been constructed on one target. Ground EM surveys and a 3100 line km airborne survey have been done and target testing by drilling will follow.
June 30, 1996
48 prospects have been located and sampled. In addition, two prospects, the massive sulphide target (Kokbit) and a porphyry copper deposit (Ozerny), were being evaluated and tested by drilling.