CLUSTER/CHERT RIDGE
|
|
Key Facts
New to Company & PropertyMine?
Start Here » Comparable Properties
|
Latest Information June 30, 2008 The objective is to extend the mineralized structure within the 16km-long portion of the Chert Ridge geophysical trend that is under license and to follow the shoots down plunge and to identify additional high-grade zones of mineralization. May 5, 2008 Results of the recent 4,436-metre aircore drill program conducted at the Chert Ridge project include 4 m of 1.49 g/t Au from 11 m in hole BCCA055. March 31, 2008 An open-ended and continuous gold-mineralized structure exceeding 2,200m in strike has been defined by drilling to date. Two potentially economic shallow-plunging high-grade zones with a cumulative strike of 720m have been defined within this overall strike. |