Mt Isa Metals announced a maiden Inferred Mineral Resource for the D-Tree Direct Shipping Ore (DSO) Project, at a 25% P2O5 cut-off grade with 1,035,000 tonnes at 29.4% P2O5 and 3.0% Fe2O3.
Mt Isa Metals announced that a maiden Inferred Mineral Resource estimate has been completed for the D-Tree phosphate deposit within tenement EPM 14753 together with an updated global resource figure for all granted tenements within the D-Tree project area located in Queensland, Australia. The global Inferred resource is estimated at 305 million tonnes grading 15% P2O5.
Mt Isa Metals announced further drill results at the D-Tree Phosphate project, Queensland, Australia. To date, a total of 122 holes for 4,615 metres have been drilled. Highlights include hole DTRC0502 intersecting 4.0 meters averaging 32.13% P2O5.