DOSSI (BURKINO FASO GOLD)
|
Property NewsJuly 31, 1996 2 quartz veins over 100 m long yielded values of up to 70 g/t gold on the south end of the concession. Composite of the second vein yielded 30 g/t gold in the wallrock averaging 10 g/t gold. 1,440 m of RC drilling and 2,000 m of diamond drilling was recommended. July 31, 1996 2 quartz veins over 100 m long yielded values of up to 70 g/t gold on the south end of the concession. Composite of the second vein yielded 30 g/t gold in the wallrock averaging 10 g/t gold. 1,440 m of RC drilling and 2,000 m of diamond drilling was recommended. May 31, 1996 Geochemical in-fill surveying was underway and RC drilling was completed.
|