|
Property NewsJanuary 31, 2005 There was no body of commercial ore.
In 1996, a 2,440 m drill program was planned for the property. January 31, 2005 There was no body of commercial ore.
In 1996, a 2,440 m drill program was planned for the property. August 31, 1995 An IP survey had begun and a 300 sample soil survey completed.
In 1990, one drill hole was completed.
In 1987, a total of 15 drill holes were drilled to test geochemical anomalies and the fault structure. Low but anomalous concentrations of gold were intersected in 12 of the holes. A soil sampling program was also completed in 1987.
|