|
Property NewsJuly 31, 2008 Murgor has not carried-out any exploration work at the Eagle River property since the fall of 2005
The summer 2005 exploration program at Eagle River consisted of property-scale geological mapping and
prospecting carried-out simultaneously with a B-horizon soil survey. The soil surveys were designed to cover
ground and helicopter-borne electromagnetic conductors. Zones of interest were later tested by mechanical
trenching during the fall of 2005.
Only a few conductors were explained by surface prospecting. Samples of exhalative units near those conductors
returned assays of up to 0.05% Cu and 0.2% Zn. A number of strong B-horizon soil anomalies were located over
EM conductors with values of up to 743 ppm for Cu, 887 ppm for Zn, 100 ppm for Pb and 25 ppb for Au. A
mechanical trenching and sampling program was carried-out in the fall 2005 to test those geochemical anomalies
and although sulphide zones were discovered, no significant values were encountered. November 27, 2004 Drilling commenced and 5 holes were completed until holiday shut down. Drilling will recommence in mid-Jan/05. September 30, 2004 Received the interpreted results from the 32 kilometers IP survey completed in late-August on the NE part of the property. A number of chargeability anomalies have been detected that need further testing.
|