Stream silt and soil sampling together with a geophysical survey and geophysical mapping were planned to identify drill targets.
January 31, 2001
Stream silt and soil sampling together with a geophysical survey and geophysical mapping were planned to identify drill targets.
October 31, 1999
During staking, 25 stream silts, 33 soil samples, and 32 rock samples were taken over the claims and analyzed for 36 elements. Anomalous values were received in Au, Cu, Mo, Zn, Ag, W, Sr, Sb, Sb, Te, Bi, and As.