Hole EBD08016 returned 11.5 m of 0.84 g/t Au from 19.6 m and hole EBC08015 returned 0.9 m of 2.46 g/t Au from 105 m.
February 21, 2008
Announced the assay results for the remaining five diamond drill holes in last year’s drilling program which consisted of seven completed drill holes, for a total of 669.7 m. These holes combined with earlier high grade holes confirm the occurrence of large halos of disseminated mineralisation around the central shear zone, which is usually occupied by a massive quartz veined system that was the basis of previous mining. Hole EDB07006 completed at True Blue (strike length 50 m and on strike with Queenslander) returned the highest grade intersection of 3.4 m @ 5.64 g/t Au. Two holes completed at Queenslander (strike length 350 m) included 3.8 m @ 1.09 g/t (hole EDB07004) and 4.0 m @ 1.16 g/t Au (hole EDB07005).
January 10, 2008
Announced the assay results for the first two diamond drill holes in last years’ drilling campaign which totalled seven completed drill holes, for a total of 669.7 m. The two holes were drilled into the Queenslander North prospect on EPM 12119. Hole EBC07001 intersected 27.1 m @ 1.08 g/t Au (from 41.0 m down the hole)
The intersection includes 1.5 m @ 4.54 g/t (from 46.1 down the hole) and 4.1 m @ 3.0 g/t (from 52.9 m down the hole)