March 2, 2007
A technical report is recommending the property for additional diamond drilling to test the depth and down plunge potential of the A Zone. Drill sections 900 E and 1000 E should be tested at depth. Shallow diamond drilling is warranted for the eastern portion of the A Zone on sections 1600 E and 1700 E.
October 17, 2006
9 diamond drill holes (EL 030 to EL 038) were completed in the summer/fall on the A Zone. A total of 2097.06 m of NQ diamond drilling tested the A Zone over a strike length of 500 m and to vertical depths of 320 m. The diamond drill core was geologically logged and samples collected for assay. A total of 348 split core samples were collected from 324.61 m of diamond drill core. These samples are currently stored at the offices of Westport Resources (Namibia) (PTY) Ltd.