March 31, 2000
An advanced recovery program using high-pressure water removal of the dump face increased the recovery to 400 t/d. This expanded operation is projected to process 120,000 t/y of tailings at an average grade of 1.2 g/t Au.
March 31, 2000
An advanced recovery program using high-pressure water removal of the dump face increased the recovery to 400 t/d. This expanded operation is projected to process 120,000 t/y of tailings at an average grade of 1.2 g/t Au.