August 4, 2011 Geodex Minerals Ltd. has acquired the Dungarvon Project (formerly known as the Falls Creek Project) through an option to purchase agreement.
June 25, 2008 Reported analytical results for drill core samples from Falls Creek drill hole No. 4717-07-007. Hole 007 intersected a 64.15 m wide Lower Zone of significant molybdenum (Mo), tungsten (W), and bismuth (Bi) mineralization in the Dungarvon Granite. The intersection, which averaged 168 ppm (0.34 lbs/ton) Mo, 156 (0.31 lbs/ton) W, and 76 ppm (0.15 lbs/ton) Bi, included 17.7 m averaging 388 ppm (0.78 lbs/ton) Mo, 173 ppm
(0.35 lbs/ton) W, and 110 ppm (0.22 lbs/ton) Bi.
March 18, 2008 Announced partial results from the latest drill program on the Falls Creek property. Three holes (holes 005 -007) totalling 1,635 ms were drilled in late fall to further evaluate the W-Mo potential of the Dungarvon Granite on the same section as the 4 holes drilled last summer. Best results include Hole 4717-07-006, which returned 85.05 m of 60.47 ppm W and 319.50 ppm Mo from 528.95 m.