FLAGBASE

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
*PLEASE NOTE*
THIS RECORD HAS BEEN ARCHIVED AND IS NO LONGER BEING UPDATED.
THIS INFORMATION HAS BEEN LEFT FOR HISTORICAL RESEARCH PURPOSES.
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
FLAGBASE
Classification: Archive
Status: Exploration
Type of Work: Placer
Location: Ghana
  • Property Map
Research - Professional or Research - Advanced Subscriber Access Required
Subscribe Today


Property News

May 31, 1998
A machine trenching program was planned for the Central Zone to detail previously hand trenched structures which revealed values such as 11 m of 7.1 g/t Au, 14 m of 12.0 g/t Au, and 18.5 m of 3.6 g/t Au. Plans also included machine trenching the Northwest and Diewum Zones, in the vicinity of the Central Zone. This trenching was to be the last phase of exploration prior to the commencement of a two stage 3,000 m diamond drill program on the three mineralized structures. Each of the structures measured between 100 and 150 m in width and are open in length, each one having been traced over a minimum of 1 km.
May 31, 1998
A machine trenching program was planned for the Central Zone to detail previously hand trenched structures which revealed values such as 11 m of 7.1 g/t Au, 14 m of 12.0 g/t Au, and 18.5 m of 3.6 g/t Au. Plans also included machine trenching the Northwest and Diewum Zones, in the vicinity of the Central Zone. This trenching was to be the last phase of exploration prior to the commencement of a two stage 3,000 m diamond drill program on the three mineralized structures. Each of the structures measured between 100 and 150 m in width and are open in length, each one having been traced over a minimum of 1 km.
November 30, 1996
The Forestry Department Ministry in Ghana temporarily suspend drilling operations. Drilling was to continue upon the issuance of the permits. Prior to the stoppage request, a 100 m hole of a planned 5,000 m diamond drill program had been completed.
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish