|
Property NewsNovember 30, 2004 Drilling has intersected large zones of disseminated low grade mineralisation some as large as 40m in width that include more narrow zones of higher grade mineralisation (up to 5.72 g/t gold over 7m). The drilling completed (12 holes, approximately 1200m) was spread around an extensive area of jasperoid alteration surrounding the Gaolong dome complex. November 30, 2004 Drilling has intersected large zones of disseminated low grade mineralisation some as large as 40m in width that include more narrow zones of higher grade mineralisation (up to 5.72 g/t gold over 7m). The drilling completed (12 holes, approximately 1200m) was spread around an extensive area of jasperoid alteration surrounding the Gaolong dome complex. July 31, 2004 Drilling begun on the property.
|