• InfoMiner
  • LinkedIn
  • InfoMine Feed

GEORGETOWN / MAUREEN

Mo
11.11
USD/lb
1.03
green
Data as of May 23, 2013 12:00AM UTC
U
40.50
USD/lb
-0.49
red
Data as of May 20, 2013 12:00AM UTC


Key Facts
Status: Advanced Exploration
Type of Work: Surface
Location: Queensland, Australia
                 45 km North of GEORGETOWN

Commodities: Fluorite, Molybdenum, Uranium
New to Company & PropertyMine?
Start Here »


Latest Information
January 15, 2009
Reported update on exploration progress. Results were received for four diamond core holes (total 917 meters) and three RC holes (total 504 meters) drilled in the Central 50 prospect area. The better intersections in the 2008 drilling programme (Table 1) include 2 meters @ 0.21% U3O8 (Hole 209), 24 meters @ 0.07% U3O8 (Hole 210), 15 meters @ 0.10% U3O8 (Hole 212) and 21 meters @ 0.08% U3O8 (Hole 215). Insufficient information is available to determine the true widths represented by these intersections. Results were received for four diamond core holes (total 620 meters) drilled to investigate the Two Gee Prospect. The four holes intersected only low grade uranium mineralisation within rhyolite, brecciated rhyolite and volcaniclastic sandstone. In addition, two RC holes (total 198 meters), drilled to test a radiometric anomaly east of the Apollo Fault Structure, failed to intersect anything of economic significance
July 21, 2008
TECHNICAL REPORT (NI 43-101) - ENGLISH
December 4, 2007
Announced an updated on the Georgetown project, where 35 RC holes totaling 4,194m were drilled. Results included 19m @ 0.21% Mo from 162m hole depth in Hole 9257, 22m @ 0.34% Mo from 99m in Hole 9262, and 4m @ 0.28% Mo from 129m in Hole 9265. Also drilling of a zone of elevated molybdenum immediately south of the resource intersected 4m @ 0.11% Mo from 25m hole depth in Hole 9251, and 7m @ 0.19% Mo from 46m in Hole 9253.

Copyright © InfoMine Inc. Developed and maintained by InfoMine Inc. All rights reserved.