Detailed ground gravimetric and magnetometric surveys were conducted in the 2nd quarter over the pipe and other prospective targets in the area. This survey has indicated the existence of a northward extension to the known pipe that potentially increases its size by 30%. This extension has not been previously tested.
December 31, 2003
In the Eleazar property 5 km northeast of oedgevonden, a survey was conducted, which centered over a prominent shallow depression has shown a gravity anomaly that may indicate the presence of a previously unknown kimberlite.
June 30, 2003
A combined gravimetric and magnetometric survey was commenced in June over two target blocks each measuring 800m by 800m. The results of this survey are being analysed.