HIDDEN VALLEY GOLD PROJECT (MOROBE MINING JV)

Mining Company & Property Database
Detailed information on thousands of mining companies and mineral properties
Company/PropertyMine Usage VideoNew to Company/PropertyMine?
HIDDEN VALLEY GOLD PROJECT (MOROBE MINING JV)
Classification: Active/Verified
Status: Producer
Type of Work: Open-Pit
Location: Papua New Guinea
Research - Professional or Research - Advanced Subscriber Access Required
Subscribe Today

Comparable Properties

Compare Properties in a Table


Property News

April 23, 2012
Newcrest Mining Ltd. provided a company update.
January 28, 2010
Newcrest Mining Limited reported on activities at the Hidden Valley development in Papua New Guinea during the quarter ended December 31, 2009. Gold production for the quarter was 43,028 g based on Newcrest's 50% share of production. Construction of the 5km overland conveyor linking the Hidden Valley pit with the processing plant was completed during the quarter. The processing plant ramp up continued during the quarter with ore sourced from the Hamata pit and mill throughput reaching 85% of design capacity in December. The processing plant was expected to reach full production during the March 2010 quarter following commissioning of the flotation circuit.
October 22, 2009
Newcrest Mining report project construction and process plant commissioning activities were delayed during the quarter. Exceptionally heavy rain during July (exceeding a 1 in 20 year event) and the premature failure of a mill gearbox and plant modifications in September significantly impacted commissioning production. Newcrest’s 50% share of production for the quarter was 3,168 ounces. Mill utilisation and throughput rates after the gearbox repairs and Carbon-in-Leach (CIL) plant modifications were ramping-up satisfactorily. Overland conveyor construction was similarly impacted by wet weather and is behind schedule. Construction should be substantially complete by the end of November.
Home | News | Companies/Properties | Countries | Suppliers | Careers | Library | Maps | Tools
Investment | Commodities | Equipment | Consultants/Specialists | EduMine | Technology | Events | SoftwareMine
Editions | Mine Sites | Mine Costs | About| Contact | eStore | Advertise | Subscribe | FAQ
Dictionary | Demo | Copyright | Disclaimer | Privacy Policy | Site Map | Español/Spanish