INTERMEDIATE ORE ZONE (BLOCK A)
|
|
Key Facts
Location:
Indonesia
0 km of IRIAN JAYA Commodities: Copper, Gold, Silver
New to Company & PropertyMine?
Start Here » Comparable Properties |
Latest Information December 31, 2002 Production is at the 3,475-meter elevation level and totaled 7.1 million metric tons of ore in 2002 and 7.6 million metric tons of ore in 2001. The zone is expected to be fully depleted by the second half of 2003. In 2001, production was at the 3,475-meter elevation level and totaled 7.6 million metric tons of ore in 2001. The Intermediate Ore Zone was estimated to be depleted by 2003. In 1998, production was at the 3,550 m elevation level, approximately 300 m below the Ertsberg East deposit. Prouduction for the year totalled 4.9 million metric ton of ore. In 1997, output from the IOZ mine totaled approximately 3.9 million metric tons of ore. In the first half of 1994, production began. December 31, 2002 Production is at the 3,475-meter elevation level and totaled 7.1 million metric tons of ore in 2002 and 7.6 million metric tons of ore in 2001. The zone is expected to be fully depleted by the second half of 2003. In 2001, production was at the 3,475-meter elevation level and totaled 7.6 million metric tons of ore in 2001. The Intermediate Ore Zone was estimated to be depleted by 2003. In 1998, production was at the 3,550 m elevation level, approximately 300 m below the Ertsberg East deposit. Prouduction for the year totalled 4.9 million metric ton of ore. In 1997, output from the IOZ mine totaled approximately 3.9 million metric tons of ore. In the first half of 1994, production began. |